The lags should pass through by at least 1 2 on the back side of the band board.
Attaching ledger board under gutters.
This is a side view of the perspective diagram above.
These 18 articles will teach you how to install flashing and bolt the ledger connection to the house rim.
Squeeze the sides of joist gutter to ensure a tight fit in the joist rail slots.
Things you will need tape measure 1 2 inch pvc pipe hacksaw power drill abu66 post base lag screws galvanized bolts washers nuts wrench.
Hold the ledger in place with nails.
Attaching a deck ledger securely is only half the work of installing a ledger.
Properly installing a ledger board for your deck is one of the most important structural components of building a safe and strong deck.
In this instance minimum 1 2 lags are staggered along the length of the board.
The other half is flashing the ledger to prevent water from getting behind it which would lead to decay of the wall sheathing rim joist and wall plate or mudsill.
Because a ledger board is very heavy and hard to work with you need to drive framing nails 16 penny or screws every two feet to temporarily attach the ledger.